Yozni.Login
Assamtransport-infrastructure

Development Of Playfield Under CMSGUY

"Development of Playfield" is an Infrastructure Development Scheme by the Assam Youth Development Mission Society (AYDMS) formed under CMSGUY Scheme. It has been decided to develop 500 Football Playfields during 2017-18 in the first phase of operation of the scheme.

Ministry / Department
Sports and Youth Welfare Department
Level
State
Benefit type
other
Last verified: Recently

What is Development Of Playfield Under CMSGUY?

"Development of Playfield" is an Infrastructure Development Scheme by the Assam Youth Development Mission Society (AYDMS) formed under CMSGUY Scheme. It has been decided to develop 500 Football Playfields during 2017-18 in the first phase of operation of the scheme.

Benefit
Facilities Proposed to be Created: Improvement of the existing playfield with earth-filling, leveling with approved soil or as per requirement. Turfing with local suitable grass. Dressing room for boys, girls, and officials with electricity and provision for adequate running water in the toilet. Fixing of Football Goal Post of standard size (one pair) 24 feet x 8 feet made of GI Pipe of 4” to 5” in diameter with white paint. Boundary Wall. NOTE: The playing facilities for Volleyball can also be developed where spaces are available. Football Ground: (Dimension of Football Field as per FIFA) Standard: Length: Minimum 90 metres / Maximum 120 metres; Width: Minimum 45 metres / Maximum 90 metres International: Length: Minimum 100 metres / Maximum 110 metres; Width: Minimum 64 metres / Maximum 75 metres The minimum available playing area of the existing field should be: Length: 90 metres; Width: 45 metres The size of the Goal Post is 24 ft x 8 ft and made of 5-inch diameter steel tubular pipe with white paint. Volleyball Court: The size of the Volleyball ground is 18 metres x 9 metres The height of the Volley Post is 2.43 metres for men and 2.24 metres for women made of 5-inch diameter steel tubular pipe with white paint and adjustable height for men & women both. The earth filling should be done with sandy and loamy soil. The compaction of the playfield should be made with a light roller not exceeding 2 tons.
Level
State — Assam
Ministry / Dept.
Sports and Youth Welfare Department
Benefit type
other
Key eligibility
1. The Schools, Colleges, Clubs, and other Sports Organizations have playgrounds measuring a minimum of 120m in length x 90m in breadth that will be considered for development. 1. The Schools, Colleges, and Clubs having requisite suitable land in the area can apply in a prescribed format to take up
Last verified
Recently

Benefits

Facilities Proposed to be Created: Improvement of the existing playfield with earth-filling, leveling with approved soil or as per requirement. Turfing with local suitable grass. Dressing room for boys, girls, and officials with electricity and provision for adequate running water in the toilet. Fixing of Football Goal Post of standard size (one pair) 24 feet x 8 feet made of GI Pipe of 4” to 5” in diameter with white paint. Boundary Wall. NOTE: The playing facilities for Volleyball can also be developed where spaces are available. Football Ground: (Dimension of Football Field as per FIFA) Standard: Length: Minimum 90 metres / Maximum 120 metres; Width: Minimum 45 metres / Maximum 90 metres International: Length: Minimum 100 metres / Maximum 110 metres; Width: Minimum 64 metres / Maximum 75 metres The minimum available playing area of the existing field should be: Length: 90 metres; Width: 45 metres The size of the Goal Post is 24 ft x 8 ft and made of 5-inch diameter steel tubular pipe with white paint. Volleyball Court: The size of the Volleyball ground is 18 metres x 9 metres The height of the Volley Post is 2.43 metres for men and 2.24 metres for women made of 5-inch diameter steel tubular pipe with white paint and adjustable height for men & women both. The earth filling should be done with sandy and loamy soil. The compaction of the playfield should be made with a light roller not exceeding 2 tons.

Eligibility

1. The Schools, Colleges, Clubs, and other Sports Organizations have playgrounds measuring a minimum of 120m in length x 90m in breadth that will be considered for development. 1. The Schools, Colleges, and Clubs having requisite suitable land in the area can apply in a prescribed format to take up Area: AssamBenefit: other

Documents Required

    How to Apply

    1. Step 1: Offline application — step 1

      Interested Schools, Colleges, Clubs, and other Sports Organizations can apply to the District Sports Officers (DSOs) in the format prescribed in Annexure-I of the scheme guidelines.

    Sources & References

    Ready to apply?

    Applications are accepted only on the official government portal.

    Open Official Website

    Find Similar Schemes

    education-learningIndia

    AICTE - Grant For Augmenting Infrastructure In North Eastern Region

    The scheme "AICTE - Grant for Augmenting Infrastructure in North Eastern Region (GAINER)" was introduced by AICTE to enhance the functional efficiency of the technical institutes located in far-flung areas of North East India, by addressing deficiencies in water, electricity, and internet.

    agriculture-rural-environmentIndia

    Agricultural Marketing Infrastructure

    The revitalized and farmers’ income enhancing centric sub-scheme Agricultural Marketing Infrastructure (AMI) of Integrated Scheme for Agricultural Marketing (ISAM) is meant for holistic development of agricultural value chain critically focusing each linkage of post-harvest value chain.